Saturday, November 7, 2009
Today, Reid power washed the west wall of the back building, which was filthy from the demolition this past summer. We are prepping the surface - removing loose paint and dirt - so that we can tuckpoint loose brick next weekend and paint the weekend after that (hopefully!)
Alex and Eileen helped scrape and paint the lintels and sills on the east wall of the rear building. You can see the difference between the ones on the left of the picture and the unpainted lintel/sill on the right.
Hopefully we'll have enough time and good weather to repaint all of the exterior painted surfaces while we still have the lift.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment